欢迎进入环球UG官网(UG环球),环球UG官方网站:www.ugbet.us开放环球UG网址访问、环球UG会员注册、环球UG代理申请、环球UG电脑客户端、环球UG手机版下载等业务。

首页社会正文

KPower gets four-year PPA extension

admin2022-08-259

澳5彩票官网www.a55555.net)是澳洲幸运5彩票官方网站,开放澳洲幸运5彩票会员开户、澳洲幸运5彩票代理开户、澳洲幸运5彩票线上投注、澳洲幸运5实时开奖等服务的平台。

In a filing with Bursa Malaysia, KPower said the EC had vide its letter extended the final closing date from June 30 to Sept 30, 2022.

PETALING JAYA: KPower Bhd’s subsidiary – PKNP KPower Suria Sdn Bhd (PKSSB) – has obtained an extension from the Energy Commission (EC) for the development of a 50MW solar photovoltaic plant in Pahang.

In a filing with Bursa Malaysia, KPower said the EC had vide its letter extended the final closing date from June 30 to Sept 30, 2022.

,

usdt支付接口(www.trc20.vip)是使用TRC-20协议的Usdt第三方支付平台,Usdt收款平台、Usdt自动充提平台。免费提供入金通道、Usdt钱包支付接口、Usdt自动充值接口、Usdt寄售回收。菜宝Usdt钱包一键生成Usdt钱包、一键调用API接口、一键出售Usdt。

,

KPower said the scheduled commercial operation date had been extended to Dec 31, 2023 from Sept 30, 2023 while the tenure of the power purchase agreement or PPA was from 21 years to 25 years.


转载说明:本文转载自Sunbet。

网友评论